Our Projects

SAI kitchen Hub - Scarborough

Catering kitchen facility: Installation of four cooking stations featuring stainless steel hoods, rooftop exhaust systems, and make-up air units equipped with demand control ventilation (DCV) systems in accordance with local codes. The scope also includes installation of fire suppression systems, HVAC units, distribution ductwork, and diffusers.