Our Projects
Jane Temple - Brampton
Installation of two 10-ton Climate Master geothermal heat pump units, integrated with five Trane hydronic air handling units. The scope also includes the complete installation of the pump system, piping, and in-floor heating tubing and manifolds.
Jane Temple-4
Jane Temple-3
Jane Temple-2
Jane Temple-1